Ritz Carlton Project in Hong Kong with Edge-Core Networks

The challenge: providing Wi-Fi service to 312 rooms and public areas and ensuring seamless roaming for VoIP calls--and testing and installing the wireless solution more than one hundred stories up while the building, the tallest in Hong Kong, was still under construction.

Download Link
Technology: Networking
Sector: Construction
Sector: Travel
Manufacturer: Edge-Core

Miron Construction Builds Better Backup Strategy with ExaGrid

Miron had been backing up its data to tape but wasn’t able to complete the jobs within its defi ned backup window. With nightly full backups sometimes exceeding 14 hours, the fi rm was having trouble getting complete copies of its entire data set.

Download Link
Manufacturer: Exagrid
Sector: Construction

Riverbed Steelhead® Appliances Solve Remote Site IT Problems for Large Construction Firm Across its Global Enterprise

Lagan Construction operates its business through a network of offices and temporary site locations across the world. The company requires all site locations to be IT-enabled quickly, with the site infrastructure to be managed from head office in Belfast, and minimal local specialist expertise.

Download Link
Manufacturer: Riverbed
Sector: Construction

CNP consolidates data and accelerates applications with Steelhead appliances

Based in Esher, Surrey and, initially, with two satellite offices connected via a 1 Mbps, ADSL-based VPN, CNP’s original network was designed to meet the needs of a successful regional building & construction consultancy. A Microsoft Exchange Server at each site delivered Outlook email to its 110 staff, and a Blackberry remote access terminal server supported mobile workers. Back-up and storage was via a mixture of in-house tape libraries and third-party online services.

Download Link
Technology: Storage
Sector: Construction

Riverbed® Steelhead® appliances give temporary construction sites LAN-like performance for civil engineering firm.

Throughout the BAM Civiel organization and its IT department, flexibility is a key requirement.The projects call for qualitatively high-grade project teams with access to excellent facilities that can guarantee the level of quality that BAM has become synonymous with. However, each project site, irrespective of its size, is always temporary.

Download Link
Manufacturer: Riverbed
Sector: Construction
Sector: Engineering

 
 
IS YOUR CASE STUDY MISSING?
Email your case study to marketing@zycko.com
 
PDF